Photo Gallery
Memorial
Overview
Systems
- Thor
- Thor Able
- Thor Able Star
- Thor Delta
- Delta A, B, C, D, E, G, L, M, N
- Delta 2000 and 3000
- Delta II
- Delta III
Other Programs
- ASSET (Aero thermodynamic/Elastic Structural Systems Environmental Test
- Echo
- Relay
- Explorer
- OSO (Orbiting Solar Observatories)
- Pioneer
- Tiros
- GOES (Geo-stationary Operational Environmental Satellite)
- INTELSAT
- FLTSATCOM
- NATO
- SKYNET
- TELESAT
- PALAPA
- WESTAR
- SATCOM
- MARISAT
- GPS (Global Positioning System)
- Mars Exploration Rovers – Spirit and Opportunity
- GRAIL
Cost: $3,503,000 each pad
Launch Complex 17 Highlights
- April 1956 – Construction underway
- September 1956 – Air Force accepted Pad 17B
- 29 November 1956 – Construction completed
- 25 January 1957 to 17 December 1959 – Total of 26 Thor launched from Pad 17B
- April 1957 – Air Force accepted Pad 17A
- 30 August 1957 to 28 January 1957 – Total of 5 Thor were launched from Pad 17A
- 23 April 1958 to 1 April 1960 – Total of seven were launched from Pad 17A. Payloads were Explorer, Transit, Pioneer and Tiros
- 17 August 1958 to 8 November 1958 – Thor Able I series launched from Pad 17A. Three were launched with Pioneer payloads
- 23 January 1959 to 11 June 1959 – Total of 6 Thor Able II launched from Pad 17A
- 14 April 1960 to 10 May 1962 – Total of 10 Thor Able Star launched from Pad 17B
- 10 July 1962 – First Delta launched from Pad 17B
- 10 July 1962 to 7 September 1967 – Total of 27 Delta B, C, E and G launches from Pad 17B
- 31 October 1962 – One Thor Able Star launched from Pad 17A
- Early 1960’s – Modified Pad 17A to support Thor Delta
- 13 May 1960 – First Delta launched Pad 17A
- 13 May 1960 to 27 August 1969 – Total of 44 Delta A, B, C, D, E, G, L, M and N launches from Pad 17A
- 18 September 1963 to 23 February 1965 – Total of 6 DSV-2G ASSET (Aerothermodynamics Elastic Structural Systems Environmental Test) launched
- April 1965 – Air Force transferred launch complex to NASA
- October 1968 – Complex returned to Air Force to support Delta II launches
- 22 September 1972 to 12 June 1990 – Total of 41 Delta 1000, 2000, 3000 and 4000 launched
- 26 August 1975 to 26 February 1987 – Total of 34 Delta 2000 and 3000 from Pad 17A
- 14 February 1989 – First Delta II launched from Pad 17A
- Launch complex modifications to support Delta II included raising the Mobile Service Tower from 112′ to 126′, structural repairs and systems replacement
- 14 February 1990 – First Delta II launch was from Pad 17B
- 12 January 1997 – Blockhouse closed after Delta II failure from Pad 17A. Launch operations moved to Delta Launch Operations Control Facility.
- 1997 – Pad 17B modified for Delta III
- 26 August 1998 to 23 August 2000 – Total of 3 Delta III launched
- 10 September 2011 – Final mission from Launch Complex 17, GRAIL lunar mission
- December 2013 – Blockhouse demolished